Gram Panchayat|LGD 232566Water profile
Alankuppam
Part of Madhanur block, Tirupathur district.
Every household has a tap, drawn from an aquifer in deficit
All 729 households report a tap connection, while Ambur is assessed over exploited at 150.0 percent of extraction. Service is complete; the source is not secure.
729 of 729 households, across 5 habitations.
Ambur is assessed over exploited. This describes the taluk, not this Panchayat.
30 rain days between 2026-08-02 and 2026-09-01, modelled rather than gauged.
Safe on 2024-07-25. 11 samples over 2 years, none of them recorded unsafe.
Place and boundary
The mapped extent comes from the TNGIS Panchayat polygon for this LGD code, so the place on the map is the place the records describe.
- LGD Panchayat code
- 232566
- Block
- Madhanur
- District
- Tirupathur
- Mapped area
- 60.036 ha
- Centroid
- 12.7568, 78.6935
Habitations
JJM records service for each habitation separately. A Panchayat total can hide a habitation that is behind.
| Habitation | Population | Households | Tap connections |
|---|---|---|---|
| A.d.colony Pudumanai | 281 | 61 | 61 |
| Adidravidar Colony | 1,023 | 241 | 241 |
| Alankuppam | 1,175 | 308 | 308 |
| M.c. Road Thoppur | 455 | 92 | 92 |
| Thouppur Pudumanai | 90 | 27 | 27 |
Groundwater, projected from the taluk
IN-GRES assesses revenue taluks. This Panchayat inherits its containing taluk's category unchanged, as containing-area context rather than a measurement of the place.
Ambur taluk, by centroid in taluk.
Groundwater drawn each year as a share of what recharges, for the whole taluk. Above 100 is more drawn than recharges.
Sub-district on the revenue hierarchy, which the Panchayat hierarchy does not nest inside.
The assessment unit is a revenue taluk, not the Gram Panchayat: each Panchayat inherits its containing taluk's category and stage of extraction unchanged, as containing-area context rather than a measurement of the place. Containment is decided by the TNGIS polygon centroid (vertex fallback for concave polygons); a Panchayat that falls in no taluk or in a taluk without an assessment is deferred, never guessed. 4 TNRD blocks span more than one revenue taluk, so a block-to-taluk name match would have been wrong.
Water-quality testing
11 samples between 2023-04-24 and 2024-07-25. 0 were taken at a source and 11 at households.
None was recorded unsafe. A clean run this long describes the reporting as much as the water, so read it as an absence of recorded failures rather than as evidence of safety.
| Year | Samples |
|---|---|
| 2023 | 5 |
| 2024 | 6 |
Land and irrigation
Census 2011, reference year 2009. A historical baseline, not current cropping.
of 73.67 ha total.
canal 0 ha, wells 28.23 ha, tanks 0 ha.
culturable waste; barren 0 ha, forest 0 ha.
Sources through the summer
Census 2011, reference year 2009.
6 source types were recorded for the year and 6 held through the summer months. None failed.
This is the 2009 pattern and says nothing about whether today’s piped supply holds through summer.
What is missing
11 of 40 capabilities are supported by acquired evidence. The rest are named here rather than left blank.
Nothing acquired for this district answers these, so they are named rather than estimated.
- drinking water source
- drinking water reliability
- groundwater level observation
- groundwater level trend
- aquifer context
- catchment context
- water body inventory
- water body condition
- waterway network
- public water works
- flood hazard
- observed flood events
- natural drainage
- wastewater service
These may not be meaningful for an inland rural Panchayat. Until that is decided, they are neither claimed nor dismissed.
- connected supply system
- surface water change
- river water quality
- engineered stormwater drainage
- wastewater treatment assets
- pollution pressure inventory
- measured water pollution
- coastal and estuarine
- current crop and irrigation state
- soil water context
- agricultural water system relation
- crop water demand
- agricultural water stress observation
- agricultural water pollution pressure
- composite priority score